The selected Construction Foreman / General Foreman will play a pivotal role in leading Rio Grande LNG's construction, pre-commissioning, commissioning, and startup testing programs. They will lead a highly talented crew of Instrumentation Technicians, Analyzer Technicians, and Control Valve Technicians. And reporting to the Mastercraft Super Senior General Foreman or prime contractor Lead Instrument Superintendent.
Candidates need to be self-sufficient, adhering to all safety, quality, ethical, and contractual requirements. Candiate need to be committed to collaboration, employee engagement, encourage curiosity and creative thinking, and deliver high-quality compliant installation.
- Major Responsibilities :
- Act as a Foreman / General Foreman directing Construction Craft Professional (Journey) activities and overseeing planning, training, ES&H, and quality.
- Implement and enforce policies, procedures, and safety standards, ensuring Zero Accident Philosophy.
- Coordinate installation solutions and inspect installed components for technical acceptance.
- Develop and apply technical competencies in the installation, testing, and troubleshooting of various control systems and instruments.
- Participates in the development of level 4 and level 5 project schedules
- Reports and reviews installed quantities to Field Supervision for verification and quantity claiming
- Prepares reports and forecasts, as required, and keeps supervisors informed on progress of overall assigned activities.
- Works with superintendents in the preparation of construction methods, schedules, manning charts, and material and equipment requirements.
- Monitors subcontractor construction schedules, resource charts, and material and equipment requirements.
Technical Competencies :
Experience with valve types, point-to-point verifications, energizations, I / O checks, and actuator installation.Knowledgeable in gas chromatography, continuous emissions monitoring, and various field instruments.Proficient in system fast loops, sample conditioning systems, and HART digital communications.Capable of oversight, planning, and performance of site acceptance testing, subsystem walkdowns, and managing punch list closeouts.Education and Experience Requirements :
Demonstrated and effective world class leader, planner, mentor, and manager of Controls System Installation and Testing Technicians in a Giga Construction Construction Project EnvironmentMinimum of 12 years in instrumentation selection, testing, calibrations, and commissioning.At least 15 years of experience in heavy industrial oil, gas, and chemical facilities.Skilled in analog and digital instrument installation, calibrations, and functional testing.Preferred Qualifications :
ISA Certified Control Systems Technician (CCST®) of any level with Level 3 being the most preferredNCCER — Industrial Maintenance Electrical and Instrument Technician most preferredNCCER — Journeyman Instrument TechnicianPAC Works or AAS in Instrumentation TechnologyFunctional Safety Assessment Level 3Experience with ABB 800XA Integrated Control and Safeguarding Systems (ICSS)Strong experience with rotating equipment such as gas turbine driven multi-stage compressorsExperience with torturous multi-path, multi-stage valve trim in anti-surge applications