Job Description
I am currently working with a succesful GC who specializes in design / build services and operates on a nationwide basis specifically on self storage facilities.
They are looking for a key on site leader responsible for the safe, timely, and high-quality execution of ground-up, multi-story, and / or conversion self-storage construction projects across Florida and the Southeast region.
Key Duties :
- Serve as the GC's primary representative on the job site, overseeing all daily construction activities for self-storage facilities (e.g., tilt-wall, metal-frame, multi-story buildings).
- Develop, maintain, and drive the 3-week look-ahead schedule. Coordinate all trades, deliveries, and inspections to ensure project milestones are met on time and within the original schedule.
- Direct, supervise, and coordinate all subcontractor activities. Lead weekly subcontractor meetings, manage conflict resolution, and ensure adherence to scope of work, quality standards, and schedule commitments.
- Oversee site logistics, material staging, and inventory control. Coordinate and confirm the timely delivery of key materials, specifically self-storage door and partition systems.
- Consistently inspect work in progress to ensure strict compliance with construction documents (plans, specifications), building codes, and industry best practices specific to self-storage design and construction.
- Implement and strictly enforce the company's comprehensive safety program. Conduct daily safety huddles / toolbox talks, weekly safety inspections, and ensure 100% OSHA and job-site-specific compliance.
- Proactively coordinate and manage all municipal and third-party inspections, resolving any issues promptly to prevent project delays.
- Prepare and submit accurate and comprehensive daily reports (Daily Logs) detailing work performed, labor hours, site visitors, equipment on site, safety issues, and weather conditions.
- Track and manage all project documentation, including RFIs (Requests for Information), submittals, and field change directives (FCDs), working in conjunction with the Project Manager.
- Maintain positive, professional, and effective communication with the Project Manager, owners, architects, engineers, and local regulatory officials.
- Monitor labor and material usage, identify potential cost overruns, and assist the Project Manager with change order processes and back charges as necessary.
Requirements :
Minimum of 5-7 years of commercial construction experience, with at least 3 years as a lead Superintendent managing ground-up self-storage or similar light industrial / retail projects.Ability and willingness to travel extensively (up to 75-100%) throughout Florida and the Southeast region, staying on location for the duration of assigned projects.Deep understanding of all construction phases, including site work, utilities, concrete, structural erection (metal and / or tilt-wall), and self-storage interior installation.OSHA 30-Hour certification is required.Proficient in construction management software (e.g., Procore, Bluebeam) and Microsoft Office Suite.