Talent.com
Construction Manager

Construction Manager

Falken Industries LLCSan Jose, CA, US
30+ days ago
Job type
  • Full-time
Job description

Job Description

Job Description : \n\nDescription : Job Req for Construction Manager San Jose, California Period of Performance October 1, 2024 through February 1, 2025 Construction Management Services (CM) Record Keeping and Progress Report / Project Files The CMa will set up job files, working folders, and record keeping systems to be used on this project. The CMa will update and complete the Inspection Plan to fit complete contract requirements in detail as directed by the CO / COR. The CMa is responsible for documenting all the major project actions, contract modifications, claims, submittals, etc. The project files must be well organized. The CMa files shall include sections for : General Correspondence (CMa-GC) Administrative Correspondence GSA Correspondence Correspondence with A / E Inspection Reports Defects and Omissions Lists Submittals Organized by Specific Section and Submittal Logs Wage Interviews Commissioning Reports Change Order Documents (Requests for Proposals), SF2437 Finding of Facts, Scope of work, Independent Estimates, GC Proposals, Technical Analysis and Negotiation Memorandum. Shop Drawings, Catalog Cuts Job Meetings with Sign-In Sheets Requests for Information (RFI) RFI with GSA or A / E Response and RFI Logs Payments Scheduling Oversight The CMa shall review the construction schedules submitted by the GC’s and make recommendations for acceptance, revision, or rejection by the GSA Contracting Officer (CO). The CMa shall verify that each activity is reasonably priced, that the schedule is not front-end loaded, and that the workflow is logical, efficient, and not contrived to neither unfairly benefit the Contractor nor jeopardize the Government. The CMa shall be overseeing the progress achieved by the GC and compare the actual progress to the master project schedule. The CMa must be continuously aware of the status of each actual project progress as compared to the planned progress. The oversight by CMa should take into consideration of progress payments, receipt of submittals, phasing, or any other sensitive activities. The CMa shall annotate the progress schedule monthly showing actual progress achieved and any adverse delays. The CMa shall anticipate delays and advise GSA when problems are predicted. The CMa shall highlight such matters in the weekly construction meetings. Submittals The CMa is responsible for coordinating submittals from receipt through approval and for returning them to the GC. The CMa shall review the submittal schedule, as developed by the GC, for reasonableness. The CMa should review the submittal package for completeness and compliance with the specification prior to forwarding on the the A / E team for review. The CMa shall monitor the GC’s submittal progress, reminding the GC of pending and delinquent submittals. If submittals are not being submitted or reviewed in a timely manner by the GC, the CMa shall notify GSA. The CMa’s submittal monitoring system should include as a minimum : The CMa is responsible for coordinating the submittals from their receipt through to their approval and return to the GC. The CMa will monitor the time of submission and the processing of shop drawings, samples and other separate Contractor submittals. If submittals are not being received in a timely manner, the CMa shall ascertain the reason therefore and take action as deemed appropriate to eliminate lags and delays. The CMa shall notify the CO promptly of any delays of the Contractor. The CMa will ensure that all submittals are submitted and approved in sufficient time to preclude delaying project completion. Progress Payments The CMa shall assist GSA in processing payments by reviewing the GC’s payment invoices and recommending to the GSA project manager the correct payment amount. The CMa shall work with the GC before the invoice is prepared, so that both parties agree on the amount of work completed and the correct amount of the invoice. Actual approval of the payment amount shall be made by the GSA CO. The CMa shall follow GSA’s procedure for progress payment review and processing, including ensuring the GC’s adherence to FAR Clauses 52.232-5, Payments Under Fixed-Price Construction Contracts (May 2014), and 52.232-27, Prompt Payment for Construction Contracts (May 2014). The CMa shall also review the GC’s Schedule of Values (SOV) to ensure that the information is correct and that the SOV is not front- loaded. The CMa is responsible for reviewing the GC’s proposed SOV at the beginning of the project and for making recommendations to GSA concerning revisions and / or acceptance. The CMa shall also verify that there is an appropriate line item with funding for project closeout since GSA does not typically hold retainage on invoices. Safety The CMa shall become familiar with the provisions of the Public Buildings Service (PBS) Handbook No. PBS P 5900.2C, Safety and Environmental Management Program. During the course of construction, the CMa shall monitor the GC’s conformance to the project safety plan. The CMa shall advise the GC immediately of any safety hazards observed. IF the remedy to a safety hazard is not apparent, the CMa may assist the GC in developing a corrective action plan. The CMa shall maintain a file of all accident and fire safety reports generated by the GC. Accident and Fire Reporting : In the event of an accident or fire, the GC, the CMa, or others familiar with the circumstances will be required to prepared and submit to GSA : GSA Form 3090, Accident Investigation Report GSA Form 53, Fire Accident Report Inspection The CMa shall be responsible for the inspection of all worked performed by the GC and for promptly notifying the GC, and the GSA CO of any discrepancies. The CMa shall plan and coordinate inspections with the GC in a manner that minimized impacts on construction operations and shall confirm that critical inspections occur as required. Inspections of critical activities may require that the GC notify the CMa and GSA in advance of certain operations. The CMa shall document and record each inspection either in a stand-alone inspection report, or within the CMa daily report. Testing The CMa must be aware of all construction elements or activities that require tests, as reflected in the construction contract. The CMa’s testing responsibilities include, but are not limited to : Verifying that tests are being conducted as scheduled Witnessing all tests to confirm that proper testing procedures are followed Monitoring test results for acceptability Retaining records of tests and results Documenting testing activities Notifying GSA of test failures and of planned correction and retesting Overseeing corrective measures arising from test failures The CMa will be held responsible for costs for retests that are not necessitated by the CMa’s failure to witness required tests. Requests for Information The CMa is responsible for coordinating RFI’s between GSA and the GC The CMa shall develop and coordinate a procedure for tracking RFIs so that all parties understand and agree to their roles and responsibilities. The CMa reviews RFIs and determines whether a response can be drafted based on a review of the contract documents. The CMa may refer the RFI to the A / Es for technical clarifications or to GSA for clarifications of general conditions. The CMa shall also assist in providing responses to RFIs related to general conditions. All RFIs relating to fire protection shall be routed to the A / E and the GSA fire protection engineers for review and response. The CMa shall develop procedures to notify all parties (the GC and GSA) of RFI responses, fully document all RFI responses, and confirm that all parties agree with the contract interpretation. The CMa shall review all RFI responses to determine whether the response will result in a change order to the GC contract. If the RFI will result in a change order to the GC contract, the CMa shall notify the GSA CO and COR to coordinate the proper response. Contract Modifications The CMa shall assist the CO in administration of changes to construction contracts. The CMa must not take any action that commits the Government to funds and should avoid any instruction to the contractor that could be interpreted as authorizing modifications to the contract. All modifications to the contract must be processed as formal contract modifications by the GSA CO. The GSA CO has the sole authority for authorizing contract modifications. a. Change Order Requests : The CMa shall evaluate all potential modifications to determine whether they are justified and within the scope of the GC contract, consulting as necessary with the Design-Bid-Build team on technical issues or with the GSA general conditions. The CMa may also assist in developing customer driven changes to the SOW. b. Requests for Proposals : If the CMa find a change order request justifiable, the CMa shall prepare a request for a change order proposal from the GC for signature by both the CO and COR. The CMa will be required to prepare a written description of the scope of the change. c. Design Deficiencies : If the reason for a change appears to be a design deficiency, the CMa should make an initial assessment of the Design-Bid-Builds’ Team liability, including documentation of the deficiency. The CMa’s assessment of the Design-Bid-Build’s Team liability will be based on a review of the contract documents and other circumstances leading to the change. The GC shall be given an opportunity to rebut any determinations of apparent design deficiencies. The GC’s position on the deficiency shall be provided to the GSA CO and the COR with the proposed contract modification. GSA shall make the final decision on liability and also on whether to pursue recovery from the GC. d. Estimates : The CMa shall prepare an independent estimate of the change and the GC’s subcontractors’ overhead and profit. The contract has all rates, prepare estimate based on these rates. The estimate shall include a detailed breakdown of labor, material, and equipment costs for the various work elements. Markups for overhead and profit, as allowed by the GC contract, will be shown separately. The estimate must be signed and dated by the preparer. The absolute sum of all cost components in a modification (additions and deductions) will determine the GSA internal approval process required for the cost estimate before acceptance by the GSA CO. The Government estimate is to be prepared before receipt of, and independent of, the GC’s proposal. e. Price-to-be-Determined-Later (PDL) Modifications : Some modifications must be expedited in order to avoid delaying construction or increasing costs excessively. In such cases, the modifications may be processed as a PDL. The GSA CO will decide if circumstances warrant expedited PDL procedures. f. CO Directed Change Orders : FAR Clause 52.243-4, Changes, authorizes a CO to issue a written order to the contract unilaterally directing changes in the work, within the general scope of the GC contract; including changes in the specifications or drawings, in the method of performance, in Government furnished facilities or equipment, in materials, in services, in site, or in directing acceleration of the performance of the work. g. Negotiations : The CMa shall determine if a change will potentially extend or shorten the specified construction completion date; include an estimate of appropriate time extension for all change orders; the CMa shall review all proposals received from the GC and develop a technical analysis. The technical analysis is an in-depth evaluation of the GC’s proposal, especially as it compares to the Government Estimate. It identifies questionable costs; excessive unit costs; differences in scope, quantities, or markups; and suggests negotiation strategies; the CMa shall assist the GSA CO / COR in establishing negotiation strategies, including negotiation cost targets or range and in negotiating contract modifications with the GC. The initial analysis should provide recommendation for acceptance or recommendations for negotiations, identifying specific negotiation objectives and cost targets or range. The CMa will support the CO / COR in the negotiations, being most familiar with the field conditions generating the change and having prepared or reviewed the IGE and having prepared a technical analysis that compares the IGE to the GC’s change order proposal. GSA will provide necessary on site representation to avoid impact on change order procedures with reasonable notice and / or scheduling. h. Documentation : After negotiating a firm-fixed prices, the CMa shall assist GSA by preparing a revised Technical Analysis based on the final negotiated amount. Progress Photographs The CMa shall photograph any work that will become hidden or covered up during the course of construction. Photos shall be labeled to indicate the project, the date taken, and what is being shown. Prior to the commencement of construction, the CMa shall photograph all existing areas surrounding the construction area that may become damaged during construction in order to provide a record of the conditions at the start of the work. Project Closeout – Final Inspection, Substantial Completion, and Final Completion The CMa shall schedule and coordinate the Final Inspection and punch list with GSA, the architect of record, and the FBI. The CMa shall have a running list of Defects and Omissions (DOs) that can be combined with the DOs identified in the Final Inspection. The CMa transmits the preliminary DO list (also referred to as the Punch List) to the GC and GSA. The CMa shall closely monitor the corrective work and update the list of DO, signing off each deficiency as it is corrected. The CMa shall prepare a project specific checklist of the items contractually required before the contract can be considered ready for settlement. The CMa shall assist the GSA CO to determine when all contractual obligations are met, and the project is ready for final completion and acceptance. Meetings and Coordination The CMa shall chair design meetings, progress meeting, coordination meetings, and required project meetings as soon as the CMa is on board through final closeout of all construction activity. The CMa shall produce and distribute meeting minutes within three (3) business days of the meeting. The CMa Shall schedule and chair coordination meetings as required to ensure construction activities. The CMa shall provide both informal and formal coordination meetings with the parties on site. As Built Drawings Verify the accuracy and completeness of all as-built drawings and ensure the contractor maintains and updates the drawings on a regular basis and include all actual locations and routings of services, all changes from the original documents, filed changes, final details, actual dimensions and other similar items on the drawings. The CMa and the construction contractor will work collaboratively to ensure that as-built and other “Controlled Unclassif

Create a job alert for this search

Construction Manager • San Jose, CA, US

Related jobs
  • Promoted
Construction Foreman

Construction Foreman

Level RecruitingSan Francisco, CA, US
Full-time
Level Recruiting is searching for a Foreman for luxury residential projects in the Bay Area.This is an opportunity to work on projects that demand the highest level of craftsmanship.You’ll be...Show moreLast updated: 10 days ago
  • Promoted
Construction Superintendent

Construction Superintendent

Uprite ConstructionOakland, CA, US
Full-time
We are seeking a highly skilled and experienced Superintendent with strong tilt-up construction experience to lead projects in the Oakland area. This person will be responsible for managing the day-...Show moreLast updated: 30+ days ago
  • Promoted
Construction Superintendent

Construction Superintendent

Condon-Johnson & AssociatesOakland, CA, US
Full-time
The Superintendent works in partnership with the Project Management team to build a safe, successful project.This position is responsible for leading the day to day operations in the field includin...Show moreLast updated: 30+ days ago
  • Promoted
Construction Manager

Construction Manager

ABC ConstructionSan Jose, CA, US
Full-time
We are seeking an experienced professional to oversee and manage our production operations, ensuring efficient and effective management of all production processes. Plan and coordinate production sc...Show moreLast updated: 30+ days ago
  • Promoted
Mission Critical Construction Manager - Northern CA

Mission Critical Construction Manager - Northern CA

AmentumSan Jose, CA, US
Full-time
Mission Critical Construction Manager - Northern California.The Mission Critical Construction Manager is a Foreman / Superintendent role responsible for managing internal and subcontractor crews for ...Show moreLast updated: 30+ days ago
  • Promoted
Construction Manager 2

Construction Manager 2

Century CommunitiesSan Jose, CA, US
Full-time
The Construction Manager 2 oversees and directs community construction projects for new home communities.The Construction Manager reviews the project in-depth to schedule deliverables, estimate cos...Show moreLast updated: 25 days ago
  • Promoted
Site Supervisor

Site Supervisor

Salvation Army Western TerritoryOakland, CA, US
Full-time
The purpose of this position is to assist the Program Director in monitoring the daily activities of the staff and children, to enforce the State and County licensing regulations throughout the Cen...Show moreLast updated: 30+ days ago
  • Promoted
Construction Manager

Construction Manager

BernhardSan Francisco, CA, US
Full-time
The Construction Manager is responsible to provide complete project field leadership and direction for day-to-day operations of the assigned project(s), in partnership with the Project Manager.The ...Show moreLast updated: 30+ days ago
  • Promoted
Construction Foreman

Construction Foreman

Zero Impact BuildersOakland, CA, US
Full-time
We are an end-to-end Renewable Energy provider, offering products to commercial and enterprise clients in EV Charging solutions, Fleet Electrification, Solar Micro-grids, Energy storage, Hydroponic...Show moreLast updated: 30+ days ago
  • Promoted
High End Residential Construction Foreman

High End Residential Construction Foreman

EsselSan Francisco, CA, US
Full-time
Essel is seeking a detail-oriented and skilled High End Residential Construction Foreman to join our client in San Francisco. In this role, you will be responsible for supervising high-end residenti...Show moreLast updated: 30+ days ago
  • Promoted
Foreman

Foreman

CyberCodersHayward, CA, US
Full-time
The Lead Driller / Foreman will oversee drilling operations and manage a team of drillers on construction sites.This role focuses on ensuring safety, efficiency, and adherence to project specificatio...Show moreLast updated: 12 days ago
  • Promoted
Subcontracting Division - Construction Foreman

Subcontracting Division - Construction Foreman

Louis Ptak ConstructionSan Francisco, CA, US
Full-time
Louis Ptak Construction Opportunity.Louis Ptak Construction has been building exceptional projects throughout California since 1998, serving as both a General Contractor and a carpentry subcontract...Show moreLast updated: 30+ days ago
  • Promoted
Construction - Superintendents

Construction - Superintendents

Essel EnvironmentalFremont, CA, US
Full-time
The right person for this position must have experience with project management, estimating, staff supervision and team-building. The ability to meet deadlines and create several estimates simultane...Show moreLast updated: 30+ days ago
  • Promoted
Construction Manager

Construction Manager

Clearance JobsMenlo Park, CA, US
Full-time +1
Akima Infrastructure Services, LLC (AIS), is actively seeking individuals who can contribute to national security within the Science & Technical fields as part of our staff augmentation team suppor...Show moreLast updated: 30+ days ago
  • Promoted
  • New!
Construction Manager

Construction Manager

Sequence SystemsSan Francisco, CA, United States
Full-time
Construction Manager – Municipal and Public Works Projects.Sequence has been exclusively retained and is currently seeking a dynamic Construction Manager. Northern California’s most respected third-...Show moreLast updated: 11 hours ago
  • Promoted
Construction Foreman (San Francisco)

Construction Foreman (San Francisco)

Level RecruitingSan Francisco, CA, US
Part-time
Level Recruiting is searching for a Foreman for luxury residential projects in the Bay Area.This is an opportunity to work on projects that demand the highest level of craftsmanship.Ensuring work i...Show moreLast updated: 8 days ago
  • Promoted
High End Residential Construction Foreman

High End Residential Construction Foreman

Essel EnvironmentalSan Francisco, CA, US
Full-time
High End Residential Construction Foreman.Essel is seeking a detail-oriented and skilled High End Residential Construction Foreman to join our client in San Francisco. In this role, you will be resp...Show moreLast updated: 30+ days ago
  • Promoted
Site Supervisor

Site Supervisor

SecuritasHayward, CA, US
Full-time
This is the main job post content.We have removed all extraneous details, links, and formatting to focus on the core information. The content is now clean and easy to read.We have also removed any m...Show moreLast updated: 30+ days ago
  • Promoted
Construction Superintendent

Construction Superintendent

Essel EnvironmentalSan Leandro, CA, US
Full-time
Essel Superintendent / Project Manager Opportunity.Essel is seeking an experienced Superintendent / Project Manager.The right person for this position must have experience with project management a...Show moreLast updated: 30+ days ago
  • Promoted
Construction Manager

Construction Manager

TradeJobsWorkforce95172 San Jose, CA, US
Full-time
Construction Manager Job Responsibilities : Oversees construction sites, general contractors, and workers to ensure a high level of quality and safety.Creates and reviews Re...Show moreLast updated: 30+ days ago